WestConnex is the largest infrastructure project in Australia, linking Western and South Western Sydney with the city, airport and port in a 33-kilometre continuous motorway. Motorists will be able to bypass up to 52 sets of traffic signals from Beverly Hills to Parramatta.

Is WestConnex complete?

WestConnex is being delivered in stages and is due to be completed in 2023.

Is M8 part of WestConnex?

The WestConnex M8 connects Kingsgrove to St Peters via new nine kilometre twin tunnels, reducing congestion and halving travel times on the M5 East motorway. The M8 runs from the King Georges Road Interchange at Beverly Hills to a new interchange at St Peters (built on the former Alexandria landfill site).

How long is the WestConnex?

33 km
WestConnex

WestConnex New South Wales
Type Motorway (Under construction)
Length 33 km (21 mi)
Opened 20 December 2016: King Georges Road interchange upgrade 15 July 2017: M4 widening 13 July 2019: M4 East 5 July 2020: M8 Motorway 2023: M4–M5 Link main tunnels, Rozelle Interchange, Iron Cove Link
Major junctions

Where does West connect start and finish?

The WestConnex M4 links to the M4 at Parramatta in the west, and Wattle Street and Parramatta Road at Haberfield to the east. The WestConnex M4 will also connect to the M4-M5 Link Tunnels and Rozelle Interchange in 2023.

Where does NorthConnex tunnel start and finish?

NorthConnex is a nine kilometre twin tunnel linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills in Sydney’s north.

How much does it cost to use WestConnex?

Toll prices – passenger vehicles, cars and motorcycles

PROJECT OPEN TO TRAFFIC MAXIMUM TOLL* (2022$)
New M4 Tunnels Now Open $4.80
WestConnex M4 Now Open $8.87
WestConnex M8 Now Open $7.52
M5 East Now Open $7.52

Where does the NorthConnex start and finish?

How much is WestConnex cost?

$16.8 billion
WestConnex

Funding Program: Investment Road and Rail Program
Transport Mode: Road
Expected Start/Finish: Early 2015 – Late 2023
Estimated Project Cost: $16.8 billion
Australian Government Contribution: $1.5 billion

What exits are on the NorthConnex?

South to North

Coming from Blacktown, Parramatta and Sydney Entry Exit
M2 Motorway northbound entry Yes No
Pennant Hills Rd, West Pennant Hills northbound on-ramp Yes No
M1 Pacific Motorway Pennant Hills Rd intersection off-ramp No Yes
M1 Pacific Motorway northbound exit No Yes

Where does the new tunnel in Sydney start and end?

The Western Harbour Tunnel will link WestConnex at Rozelle with the Warringah Freeway at North Sydney via 6.5-kilometre tunnels under Sydney Harbour, with three lanes in each direction.

Why is NorthConnex closed?

Planned Maintenance and Tunnel Closures About four times a year, planned tunnel maintenance will be carried out. During this time and for the safety of our workers, NorthConnex tunnels will close to the travelling public. Planned maintenance and tunnel closures will occur between the hours of 10pm and 5am.

Where does the M4 tunnel start and finish?

Project overview The WestConnex M4 Tunnels opened to traffic in July 2019. WestConnex M4 (the New M4 Tunnels and the Widened M4), includes 5.5km tunnels and around 7.5km of surface roads. The WestConnex M4 links to the M4 at Parramatta in the west, and Wattle Street and Parramatta Road at Haberfield to the east.

What is the most tolled city in the world?

Sydney
NSW Labor has identified the growing cost burden of road tolls on families, particularly those in Sydney’s south-west, as a key issue leading into the 2023 state election. Describing Sydney as the most tolled city in the world, it says this “addiction” needs to end.

Where does the NorthConnex tunnel exit?

Welcome to NorthConnex To travel through NorthConnex, customers can enter and exit the tunnel via the Northern Interchange at Wahroonga or the Southern Interchange at West Pennant Hills.

Who owns WestConnex?

Transurban
Transurban, as part of the Sydney Transport Partners consortium, has successfully been awarded 100% ownership of WestConnex, Australia’s largest road infrastructure project.

Where is the longest tunnel in Australia?

The M8 Motorway between Kingsgrove and St Peters is currently Australia’s longest tunnel, however the new project will exceed this by 22 per cent.

Is waterfall way open?

Waterfall Way has reopened to single lane traffic west of Thora after a massive landslip blocked access during the extreme weather that impacted the North Coast early this month.

Which is the most expensive city to live in Australia?

Sydney. Sydney is the most expensive city in Australia (and is ranked the 15th most expensive city worldwide), nearly double the prices of the country’s second most expensive city, Melbourne—and the already high costs are still rising.

What’s the most expensive toll road in the world?

the Pennsylvania Turnpike
While countries like Switzerland have the most expensive average toll price, some other areas earned their fame by being the priciest overall. At the top of that list sits the Pennsylvania Turnpike, solidifying it as the most expensive toll road in the entire world.

What is WestConnex plan your journey?

The WestConnex Plan Your Journey tool allows motorists the chance to take a “virtual drive” on the motorways, to get familiar with where the entry and exit points are and experience some of the features of the motorways.

Where does the Westconnex M4 link to?

The WestConnex M4 links to the M4 at Parramatta in the west, and Wattle Street and Parramatta Road at Haberfield to the east. The WestConnex M4 will also connect to the M4-M5 Link Tunnels and Rozelle Interchange in 2023.

What is WestConnex public art?

To celebrate the WestConnex Public Art Program, students in years 7-10 are invited to create their own artwork, inspired by the 18 signature art pieces that form Canal to Creek. Find out more here

How does the WestConnex toll work?

WestConnex has a distance-based tolling system which means motorists only pay for the section of motorway they use. When WestConnex is complete, the toll will be capped after 16km.