Create custom indicators

  1. Click Project > Custom Fields.
  2. Choose an unused text field, and then click Rename.
  3. Type Progress (or whatever name you want) and click OK.
  4. Under Custom attributes, click Lookup.
  5. In the table, add the values you want.

How do you show status in SharePoint?

SharePoint List based Status Indicator

  1. On the New Item page, under SharePoint List and View, in the List URL box, enter the URL of the list or library.
  2. In the View box, select the view that contains the items you want to use in the status indicator.

How do I add a rag status in SharePoint?

How to Create a RAG Status in SharePoint

  1. Get your Icons. First, you’ll need to add the icons you want to use to the SharePoint site.
  2. Upload Icons to the Site Assets Library. Upload the RAG icons to your site assets library in SharePoint (remember, you can just drag and drop them into SharePoint 2013).

How do I add a status field in MS Project?

Method 1:

  1. In a sheet view, select the column (field) to the right of where you want to insert the new column.
  2. Go to Format menu and click Insert Column.
  3. Specify the Field name, Title, Title alignment, Data alignment, and Width of the column.

How do I create a project management dashboard in SharePoint?

4 Quick Steps To Set Up SharePoint For Project Management

  1. Use the Quick Launch to manage project processes.
  2. Manage tasks with work management lists and dashboards.
  3. Create Project Status Reports.
  4. Use the Microsoft Project to SharePoint sync.

How do I edit a status in SharePoint?

You need to edit the Status column through the list settings. Go to list settings, click on the column name (status). Add ‘complete’ as a choice. then return to datasheet and you’ll be able to pick that.

What is KPI in SharePoint?

The SharePoint KPI field type enables you to better visualize your targets and current status by allowing you to display key performance indicator icons and progress bars in your SharePoint lists/libraries and web parts.

How do I use conditional formatting in MS project?

You will use conditional formatting to change the color of the cells and text in the status column if the status of the task matches certain criteria. To start, highlight the cells in the status column down to the end of your task list. From the format menu, select conditional formatting.

How do you create a drop down list in MS project?

Make sure Manager (Text1) is selected. In the Custom attributes section, click the Lookup button, which pops up the Edit Lookup Table for Manager dialog box. Under Value, type the items you want to appear in your drop-down list (one item per line), then click the Close button. Click OK.

Can you use SharePoint to track projects?

SharePoint Sites With lists and web parts, you can easily track and update work, as well as report on what’s happening in the project with project management dashboards.

How do I create a dashboard in SharePoint?

SharePoint Modern Experience

  1. If you haven’t already, upload the dashboard into a document library.
  2. Open the file, place your cursor in cell A1, then save the file and close it.
  3. Update permissions on the dashboard file.
  4. Create a page or designate an already-existing page that the dashboard will display.

Can you color code in Microsoft Project?

Tasks can be rolled-up at the summary level in Microsoft Project and they can be differentiated by using the color code task roll-up bars. This color coding is feasible by creating additional rolled-up task bar-style definitions, including flags to support distributing the colors among the numerous schedule tasks.

How do I create a subtask in MS Project?

To create a subtask or a summary task, indent a task below another one. In the Gantt Chart view, select the task you want to turn into a subtask, then click Task > Indent. The task you selected is now a subtask, and the task above it, that isn’t indented, is now a summary task.

Where is the field list in MS Project?

To view the “Field List” pane at the right side of the application window, select a chart within a report. Select either the “Tasks” or “Resources” hyperlinks at the top of the “Field List” pane to use your selection as the source of data for the chart.